Channel Solution · Aging-Care Projects

One Supplier for the Whole Site — Bathroom, Bedroom, Walking

A complete certificate pack for the tender, one range for the whole project, and delivery terms written into the contract.

Who is this for

This page is for you if…

  • You fit out senior living communities, care homes or home-adaptation projects
  • You kit out bathrooms, bedrooms and corridors as complete scenes, not single items
  • Your tender documents demand a certificate pack most factories cannot produce in full
  • The delivery date is in the contract — and late means penalties

The pain points

What slows this channel down

01

The tender wants documents, not promises

Bidding requires the full pack — certificates, test reports, case references. A factory that cannot produce the complete set hands you a bid you cannot submit.

02

One project, five suppliers

A single community refit needs commode chairs, shower chairs, toilet rails, walkers and crutches. When no single factory covers the range, you stitch suppliers together — and inherit their gaps.

03

Late delivery is contract penalties

Project schedules are written into the contract. A factory that cannot control its own production line is a risk you pay for.

04

Acceptance checks the real thing

The installed product gets tested: load capacity, stability, safety. A wobbly frame at acceptance means rework at your cost.

05

Custom items, custom risk

Some items need drawings and parameters. A factory that is slow or vague at sampling puts the whole schedule behind.

06

Batch two must match batch one

Phased deliveries are common — and later batches must stay identical to the approved sample, or acceptance fails.

Our answer

How we answer every one of them

✓

The complete tender pack

ISO 13485, ISO 9001, CE, FDA registration, first-class medical device filing, TÜV audit report and product test reports — organised and ready to go into the bid.

✓

One range, one supplier

Toilet rails, raised seats, shower chairs, commode chairs, walkers, crutches — bathroom, bedroom and mobility supplied in one contract, all in stock.

✓

Schedule we control

Tube cutting, injection, blow moulding, tooling and assembly inside our own 24,000 m² plant. Standard lead time 15–20 days, 50,000 units in stock as the buffer.

✓

Load tested to 1.5x

Thicker tube and reinforced frames, load-tested to one and a half times rated capacity — built to pass acceptance, not just the photo.

✓

Three days to a plan, a week to a sample

Send the drawing or parameters: plan back in three days, sample in one week. Custom items stop being the schedule risk.

✓

Batch consistency, guaranteed

Same plant, same moulds, same material lots across phases — batch two matches the approved sample.

Channel terms

Built for the way this channel buys

Tender document pack

Certificates, test reports and reference cases organised for direct submission.

Delivery terms in the contract

Dates and responsibilities written down — schedule risk sits with us.

3-day plan · 1-week sample

Custom drawings and parameters quoted fast; sampling in one week.

Batch-to-batch consistency

Phased deliveries match the approved sample — same plant, same moulds, same lots.

Client story

NordCare Solutions · Germany

One small bathroom, two dangerous steps — and a chair that removed both

In older German apartments the bathroom is small, and the two riskiest moments are the same for everyone: lowering onto the toilet, and stepping into the shower. A project supplier has to solve both in one tight space, without a building job.

NordCare fitted the YMX5209-S — a white powder-coated stainless steel shower-commode chair with a moulded seat and backrest, a seven-position frame and a square commode pan. It is a shower chair that is also a commode chair, so the same seat serves both moments, and nothing has to be moved between them.

7 positionsFrame height adjustment
2-in-1Shower and commode in one seat
1 supplierFor the whole refit range

“We usually have to choose between two products in a tight bathroom. This one solved both problems with a single chair, and the residents stopped avoiding the shower.”

— Project Manager, NordCare Solutions

Products in this story: YMX5209-S — shower-commode chair · YMX5208-S · YMX5110D-S-SRB — shower chairs

Representative client story — a market-fit example built on models from our current price list.

Ordering facts, before you ask

Legal entity
Guangdong Jinda Rehabilitation & Nursing Products Co., Ltd.
Factory location
Nanlang, Zhongshan, Guangdong, China
Facility
24,000 m² facility
Years manufacturing
16 years
Order paths
ODM from existing moulds · OEM to your drawing or sample
MOQ — stock model
50 pcs (existing model, your branding)
MOQ — colour or print change
200 pcs (existing mould, changed colour / printed pattern)
MOQ — new tooling
1,000 pcs (new mould or new structure)
Sample lead time
7 days
First order
15–20 days from production scheduling (stock models ship same day)
Repeat order
7–10 days
Payment
T/T · Trade Assurance
Certifications
ISO 9001 · ISO 13485 · CE documentation · FDA establishment registration
Packaging
Retail, marketplace/FBA and bulk packaging — built into the order, not added later
Spare parts
Long-term supply commitment for institutional and retail buyers
Shipping
FOB / CIF from South China, by sea or air

MOQ applies per SKU, not per purchase order — a three-product launch is three minimums. Certificate numbers are published on the certifications page so your importer can verify them with the issuing body.

Get the price list and MOQ sheet

One email. Material options, MOQ by product line and the tooling position — no obligation.